Township News

Posted on: May 11, 2017

Smoke Testing: Update 6/22

Streets planned for 6/22 (weather dependent)

Burnside Drive

Woodcrest Avenue

Glen Avenue

Marion Avenue

Brookside Drive


Streets planned for 6/21 (weather dependent) 

Pine Terrace East

Chatham Road

Short Hills Avenue

Cross Gates Road

Farley Road

Woodcrest Avenue

Brook Lawn Drive

Glen Avenue

Burnside Drive


Streets planned for 6/15 (weather dependent; in the event of rain these streets will be attempted the following day):

Winding Way

Pine Terrace East

Short Hills Ave

Tulip Lane

Coniston Rd

North Rd

Windermere Terrace

Old Hollow Road

Farley Road

Alan Drive

Hardwell Road

Cross Gates

Woodcrest Avenue


Streets planned for 6/15 (weather dependent):

Pine Terrace East

Campbell Road

Wellington Avenue

Meadowbrook Road

Glenwood Drive

Winding Way

Streets planned for 6/12 (weather dependent):

Chatham Road

Short Hills Avenue

Canterbury Lane

Claremont Drive

Wellington Avenue

Meadowbrook Road

Elmwood Place

Woodland Road

Dameo Place

Baltusrol Way


Update: 6/8

The following streets are being attempted today:

Forest Drive South

Chatham Road

Short Hills Avenue

Inwood Road

Stoney Lane

Oak Hill Road

Oakview Terrace


Update: 6/7

The following streets are being attempted today:

Taylor Road North

Lupine Way

Forest Drive South

Chatham Road

Hobart Avenue

South Terrace

Twin Oak Road

Short Hills Avenue

Birchwood Drive

Wellington Avenue


Update: 5/31

Smoke testing has been canceled today due to rain. The following streets will be attempted tomorrow:

Taylor Road

Lupine Way

Merrywood Lane

Featherbed Lane

Hemlock Road

North Road

Coniston Road

Forest Drive South

Chatham Drive

Hobart Avenue


Update: 5/24

Smoke testing has been canceled today due to rain this morning. 


Update: 5/23

Due to ground saturation from yesterday’s rain, there will be no smoke testing today. Streets scheduled for today will be attempted tomorrow.


Update: 5/22

Due to weather conditions, smoke testing has been canceled for today. Smoke testing will not be conducted during rain events. Savin Engineers will conduct smoke testing tomorrow, May 23rd (weather dependent), on the following streets:

Taylor Road

Brookhaven Way

Dogwood Drive

Lupine Way

Merrywood Lane

Featherbed Lane

Hemlock Road

North Road

South Terrace

Oak Road

Northern Drive

Coniston Road


Description

Millburn Township has retained Savin Engineers to conduct an infiltration and inflow study for the past few months. As a part of the infiltration and inflow study, smoke testing in designated areas are conducted. This targeted test will examine sanitary sewers looking for locations of leaks or illicit connections into the system. Beginning on May 22, 2017 the following streets will be part of the designated areas where the smoke testing will be conducted. The attached notice will also be delivered to each property owner within the designated areas below:


West Rd. 

Hobart Gap Rd 

Windermere

Lakeview

South Terrace

Old Hollow

Farley Rd

Woodcrest

Brooklawn

Cross Gates

Hardwell

Alan

Glen Ave

Cape Ct

Marion

Wittkop

Rawley Pl

Taylor St

Main St 

Chatham Rd

Woodland

Baltusrol

Birchwood

Wellington

Canterbury

Claremont

Elmwood 

Oakhill

Stony La

Oakview

Inwood

Meadowbrook

Pine Terr E & W

Short Hills Ave

Winding Way

Ferncliff

Ridge Terr

Campbell

Glenwood

Overlook

Woodcroft

Brookhaven

Taylor Rd. South

Forest Dr South

Lupine Way

Dogwood Dr.

Tulip

North Rd

Hemlock

Twin Oak

Featherbed

North

Northern

Resident Letter - Smoke Testing
Facebook Twitter Google Plus Email